Installing road and bridge accessories, gully structures

Activity Unit Labour Material
Time standard
(hour)
Skill Quantity Product
Installing plastic delineator post pcs 0.46 labourer 1 pc delineator post
Installing km stone/sign
(tubular post and plate)
pcs 1.16 labourer 1 pc post + sign
Installing traffic signs
(including/on posts)
pcs 1.78 labourer 1 pc
0.05 m3
traffic sign + post
concretex
Installing guard-rail end-piece pcs 0.24 labourer 1 pc end-piece (as planned)
Installing metal-plate guard-rail
(off 4 m long rail pieces, 
including rail-posts)
lm 2.0 labourer 0.25 pcs
1.0 m
0.03 m3
rail post
metal-plate rail
concretex
Installing angle-steel (bar) railings 
(pedestrian gaurd-rail on bridge)
lm 2.1 labourer 0.0065 t
0.0087 t
0.1 m3
rail post
rail panel
concretex
Installing chain railings/barrier lm 1.35 labourer 1.25 m
0.85 kg
0.1 m3
post
chain
concretex
Placing lamp-post anchor pcs 0.63
2.53
fitter
labourer
1.01 pcs lamp-post anchor
Installing (placing) lamp-post pcs 4.6
6.9
fitter
labourer
1.01 pcs lamp-post
Building gully structure (water sink) 
(off 50x50 cm prefabricated pieces )
lm 1.72 labourer 1.02 m gully pieces 
(blocks)
Placing gully-hole grill (48x48 cm) pcs 0.67
0.67
mason
labourer
1 pc gully-hole grill
Painting traffic-line markings 
(by machine/equipment)
painted
m2
0.36 a team of 
4-6 workers
0.56 kg
0.056 kg
0.26 kg
paint
thinner (solvent)
glass pearl
Painting traffic markings
(manually, at junctions)
painted 
m2
0.96 a team of
4-6 workers
0.74 kg
0.074 kg
0.026 kg
festék
higitó
üveggyöngy
x See Appendices