| Activity | Unit | Labour | Material | ||||
| Time standard
(hour) |
Skill | Quantity | Product | ||||
| Preparing epoxy concrete
bearing pad (shoe) |
pcs | 1.5
1.5 |
mason
labourer |
- | - | ||
| Placing and boning (adjusting level)
Neoprene bearing pad |
pcs | 1.55
0.79 |
fitter
labourer |
1.01 pcs | Neoprene
bearing pad |
||
| placing metal bolsters (wedges) at bearings | pcs | 1.35
0.6 |
fitter
labourer |
- | - | ||
| Placing and boning (adjusting level)
rubber or synthetic rubber bearing pad |
m2 | 1.25
0.63 |
mason
labourer |
1.05 m2
0.8 kg |
sheet
bond |
||
| Hünnebeck metal scaffolding | m3 |
|
fitter
carpenter labourer |
150 kg | Hünnebeck
scaffoldx |
||
| High-duty wooden scaffolding
(for bridge construction) |
m3 |
|
carpenter
fitter labourer |
0.045 m3
0.045 m3 0.055 m3 |
lumberxx
board (xx) timberxx |
||
| Lifting and placing prefabricated RC
beams, weight range below 15 t/piece, (including temporary fixing) |
pcs | 0.82
4.12 |
welder
labourer |
1.01 pcs | beam | ||
| Lifting and placing prefabricated RC
beams, weight range: 15-40 t/piece, (including temporary fixing) |
pcs | 1.18
5.9 |
welder
labourer |
1.01 pcs | beam | ||
| Bituthene insulation, 2 layers,
+ protective foil |
m2 | 0.13
0.21 |
insul.worker
labourer |
2.3 m2 | Bituthene
foil |
||
| Dehydro insulation, 2 layers,
+ protective foil |
m2 | 0.39
0.12 |
insul.worker
labourer |
2.3 m2
2.4 kg |
Dehydro sheet
bond (adhesive) |
||
| Placing synthetic rubber expansion joint | lm | 2.7
2.18 |
fitter
labourer |
1.01 m | synthetic rubber
expansion joint |
||
| Placing steel expansion joint | lm | 4.8
4.8 |
fitter
labourer |
1.01 m | synthetic rubber
expansion joint |
||
| Standing (placing) lamp-posts,
fixed by anchoring joints |
pcs | 4.6
6.9 |
fitter
labourer |
1.01 pcs | lamp-post | ||
| Manufacturing prefabricated RC beams,
step No 1 (cleaning mould, assembling, concreting) |
m3 | 1.47
2.13 2.16 |
fitter
concr.worker labourer |
x | concrete | ||
| Manufacturing prefabricated RC beams,
step No 2 (reinforcing) |
t | 23.36
8.13 |
concr.worker
labourer |
x | reinforcement
steel |
||
| Post-tensioning RC beams,
span below 25 m |
pcs | 7.93
0.29 |
fitter
labourer |
x | - | ||
| Placing drain-pipe,
fixed by/to the reinforcement |
lm | 0.3 | labourer | 1.03 lm | plastic tube | ||
| Placing and fixing cable-duct,
fixed before concreting |
lm | 0.1 | labourer | 1.03 lm | plastic tube | ||
| Placing and fixing edge-protecting
angle-steel (80.80.8) |
t | 17.5
8.7 |
fitter
labourer |
106 lm | 80.80.8
angle-steel |
||