Decoration and coating

Activity Unit Labour Material
Time standard
(hour)
Skill Quantity Product
Limewash, manual 
(3 coats)
100m2 5.96
1.98
painter
labourer
0.039 m3
1.9 kg
caustic limex
gypsum
Limewash, equipped
(3 coats)
100m2 4.72
1.58
painter
labourer
0.039 m3
1.9 kg
caustic limex
gypsum
Internal (distemper) paint, 
manual
100m2 8.74
2.91
painter
labourer
0.02 m3
21.0 kg
2.0 kg
caustic limex
Vienna white
gypsum
Exterior face decoration, 
manual (e.g. Vliesinnel)
100m2 10.98
3.67
painter
labourer
90 kg
3 kg
Vliesin
Vliesin-Fixative
Exterior face decoration
(painting), equipped
100m2 9.2
3.0
painter
labourer
90 kg
3 kg
Vliesin
Vliesin-Fixative
Surface preparation 
(stopping, sanding, dusting)
100m2 7.2
2.3
painter
labourer
3.6 kg
0.0045 m3
gypsum
caustic limex
Decoration and tapestry 
(wallpapering)
100m2 24.0 paper-hanger 114 m2 wallpaper
Unrusting on surface 100m2 7.12 painter 7 kg cleaner's naphta
Unrusting on pipes, 
diameter below 3"
100m 3.52 painter 2 kg cleaner's naphta
Priming (paint) on surface 100m2 10.96 painter 11 kg priming paint
Priming (paint) on pipes, 
diameter below 3"
100m 3.45 painter 4 kg priming paint
Covering paint on surface,
2 coats, 
100m2 21.0 painter 11 kg covering paint
Covering paint on pipes,
diameter below 3", 2 coats
100m 5.8 painter 5 kg covering paint
Enamel paint on surface 100m2 14.53 painter 13 kg enamel paint
Enamel paint, on pipes, 
diameter below 3"
100m 3.45 painter 3 kg enamel paint
x Specific weight (density) of caustic lime is about 1700 kg/m3