Fitting-smith structures

Activity Unit Labour Material
Time standard
(hour)
Skill Quantity Product
Placing steel door or window,
perimeter below 5 m
subsequent pcs 1.12
1.12
mason
labourer
1 pc elements as specified 
(door, window, etc.)
masonry
included
pcs 0.5
0.5
mason
labourer
Placing steel portal, 
door or window, 
perimeter above 5 m,
(operating devices included)
subsequent pcs 1.33
1.33
mason
labourer
1 pc elements as specified
(door, window, etc.)
masonry
included
pcs 0.6
0.6
mason
labourer
Placing handrail or scale,
pocket or anchor bolt fixing
lm 0.32
0.32
mason
labourer
1.0 lm elements as specified
(handrail, scale, etc.)
Placing structural steel elements 
(e.g. steel-frame pieces)
t 34.0
17.0
steel erector
labourer
as specified
lm = linear meter