Joinery and carpentry works

Activity Unit Labour Material
Time standard
(hour)
Skill Quantity Product
Placing door, window, gate, battening
(inwalled during masonry works)
pcs 0.7
0.7
mason
labourer
1 pc elements as specified
(door, window, etc.)
Placing door, window, gate, battening
(after masonry works, subsequently)
pcs 1.16
1.16
mason
labourer
1 pc elements as specified
(door, window, etc.)