| Activity | Unit | Weight of structural element (unit) | Skill | Material | ||||||
| 0.5 t | 2 t | 5 t | 10 t | 20 t | 40 t | |||||
| Time-standard (hour) | Quantity | Product | ||||||||
| Placing front panel, hung by
crane, fixing welded or bolted |
piece
(unit) |
0.25
0.25 0.75 |
0.33
0.33 0.99 |
0.38
0.38 1.14 |
- | - | - | welder
fitter labourer |
1.01 | prefabr.struct.
element (unit) |
| Placing (sleeve) foundation
block (on blinding) |
piece
(unit) |
- | 0.45
0.9 0.9 |
0.58
1.26 1.26 |
0.7
1.4 1.4 |
- | - | welder
fitter labourer |
1.01 pcs
0.04 m3 |
prefabr.struct.
element (unit) mortarx |
| Placing pier or column,
fixing welded, no grout |
piece
(unit) |
0.52
0.52 1.56 |
0.61
0.61 1.83 |
1.24
1.24 3.72 |
1.38
1.38 4.14 |
- | - | welder
fitter labourer |
1.01 | prefabr.struct.
element (unit) |
| Placing RC beam, lintel or
joist, fixing welded, no grout |
piece
(unit) |
0.13
0.13 0.39 |
0.52
0.52 1.56 |
0.6
0.6 1.8 |
1.23
1.23 3.87 |
2.67
2.67 8.01 |
- | welder
fitter labourer |
1.01 | prefabr.struct.
element (unit) |
| Placing floor- or roof-piece,
fixing welded, no grout |
piece
(unit) |
0.14
0.14 0.42 |
0.3
0.3 0.9 |
0.44
0.44 1.32 |
0.6
0.6 1.8 |
- | - | welder
fitter labourer |
1.01 pcs
0.012 m3 |
prefabr.struct.
element (unit) mortarx |
| Placing other elements
(arms of stairs, moulding, balcony, attic) |
piece
(unit) |
0.33
0.33 0.99 |
welder
fitter labourer |
1.01 pcs
0.01 m3 |
prefabr.struct.
element (unit) mortarx |
|||||
| Grouting fixing joints | m3 | 9.73 | labourer | 1.05 | concretex | |||||